Menu ×

Installation Guides

R-Tile Interlocking Flooring Installation Guide

This recommended method of installation has been prepared as a guide only, the information is supplied in good faith but without guarantee as site conditions vary and are beyond our control.

Where to start

The starting point for the open join tiles should always be as close to the centre of the room as possible. The hidden joint tile should start from one corner of the room.

CLICK ON INSTALLATION VIDEOS OR GUIDES FOR A FULL WALK THROUGH.

Download guides include instructions for ESD and hidden join tiles

Check out this PDF guide with a downloadable feature available.

View Installation Guides